• English
    English
  • Sign Up
  • Log in
  • Guest
    avatar
    Login Sign Up
  • Home
  • About
  • References
  • Services
    • Transformer Consultancy
    • Turnkey Transformer Factory Establishment
  • Blog
  • Pricing
  • Calculations
    • Sound Level Calculation
    • Voltage Drop Calculation
    • Volts Per Turn Calculation
    • Harmonics Calculation
    • Inrush Calculation
    • Short Circuit Forces Calculation
    • Transformer Optimization Calculation
  • FAQ's
  • Contact
Author
  •   Zenithar Company
  •   Ozan H. GUREC
  •   Ali Can CANPOLAT
  •   Rauf T. Holdur
  •   Suheyla Isik

Categories
  • News
  • Statistics
  • Transformes
  • Switchgear
  • Power Network
  • Energy
HE to upgrade Hydro-Québec’s converter station

Categories: News - 2023-08-31 10:04:06

group image

Canada, Châteauguay: Hydro-Québec selected Hitachi Energy for the Châteauguay HVDC back-to-back converter station refurbishment.

Hitachi Energy is set to upgrade Hydro-Québec’s 40-year-old Châteauguay HVDC back-to-back converter station.

Hydro-Québec is one of the largest hydroelectricity producers in the world and their Châteauguay facility connects the electrical networks of Québec in eastern Canada with the state of New York using HVDC technology. HVDC was used since the two networks are asynchronous (i.e., out of phase) and cannot be connected directly using traditional AC systems.

Originally Châteauguay consisted of two separate 500 MW converter stations with a total rating of 1,000 MW, but that is changing. In late 2022, Hydro-Québec selected Hitachi Energy to refurbish Châteauguay with its VSC-HVDC technology. It increases the facility’s rating by 50 % to 1,500 MWs. The VSC-HVDC upgrade interconnects the 735 kV Canadian grid with the 765 kV New York grid, which will increase the efficiency and controllability of the Châteauguay facility.

Because of the robustness of the original HVDC developed for this family of converters, it is possible to splice it with VSC-HVDC. That opens new doors when utilities consider upgrading their power electronics. Châteauguay’s features will include black start capabilities, require no reactive power supplements, lower active power losses, and other improved traits commonplace in today’s HVDC schemes.

This text is taken from https://transformers-magazine.com/tm-news/he-to-upgrade-hydro-quebecs-converter-station/

Latest Articles
group image
Ganz delivers transformer for a wind farm in France
2022-10-20
group image
Tanzania’s company invests $15 M into distribution transformers
2022-10-14
group image
US-funded substation inaugurated
2022-06-09
group image
What is DDP (Diamond Dotted Paper) and What is the Correct Drying Process?
2022-02-01
group image
What is HTC Transformer?
2022-01-31

Shortcut Menu


Home

About

Pricing

References

Blog

FAQ's


Calculations


Sound Level Calculation

Voltage Drop Calculation

Volts Per Turn Calculation

Harmonics Calculation

Inrush Calculation

Short Circuit Forces Calculation


Articles


Servokon Systems’ $24 million transformer manufacturing facility

Lightning strike sets substation on fire

Man electrocuted stealing transformer cables


Legal


Terms of Service

Privacy Policy

Distance Sales Agreement


Contact


Izmir, Turkey

+90 232 421 61 17

info@zenithar.net

Alsancak Mah. Atatürk Cd. No: 398/420 35220 Konak / İzmir Turkey


2020 © Zenithar