• English
    English
  • Sign Up
  • Log in
  • Guest
    avatar
    Login Sign Up
  • Home
  • About
  • References
  • Services
    • Transformer Consultancy
    • Turnkey Transformer Factory Establishment
  • Blog
  • Pricing
  • Calculations
    • Sound Level Calculation
    • Voltage Drop Calculation
    • Volts Per Turn Calculation
    • Harmonics Calculation
    • Inrush Calculation
    • Short Circuit Forces Calculation
    • Transformer Optimization Calculation
  • FAQ's
  • Contact
Author
  •   Zenithar Company
  •   Ali Can CANPOLAT
  •   Rauf T. Holdur
  •   Suheyla Isik

Categories
  • News
  • Statistics
  • Transformes
  • Switchgear
  • Power Network
  • Energy
Siemens Energy to deliver first batch of $64 M mega transformers in Nigeria

Categories: News - 2022-08-04 10:26:06

group image

Nigeria, Abuja: Siemens Energy is set to deliver the first batch of the mega transformers ordered by the Nigerian Federal Government by September 2022.

This was even as it was disclosed that the power equipment successfully underwent factory acceptance tests at Siemens Energy’s transformers factory in Trento, Italy.

In December 2021, the Minister of Finance Zainab Ahmed and the Minister of Power Abubakar D. Aliyu secured the approval of the Federal Executive Council of $64 M (€63 M) for the procurement of equipment to boost power supply under the Presidential Power Initiative (PPI).

The Federal Government, in a statement from the office of the Minister of Power Abubakar Aliyu, said that Managing Director of Federal Government of Nigeria Power Company (FGN-Power) Kenny Anuwe led a delegation that includes engineers from Transmission Company of Nigeria (TCN) to witness the factory acceptance test conducted on 28 July 2022 in Italy.

“The successful factory acceptance test shows Nigeria’s engagement with Siemens Energy is on track. It also shows the federal government’s commitment to addressing Nigeria’s electricity challenges,” said the minister.

The first phase will provide 10 mobile power substations and 10 mega transformers that will be deployed across the country to boost and stabilize electricity supply.

President Muhammadu Buhari in 2018 initiated the Presidential Power Initiative (PPI) that was to enable Siemens Energy to upgrade Nigeria’s electricity systems.

The first phase of the PPI seeks to modernise, rehabilitate and expand the national grid by investing in the electricity value chain, including generation, transmission and distribution systems.

 

This text is taken from https://transformers-magazine.com/tm-news/siemens-energy-to-deliver-first-batch-of-64-m-mega-transformers-in-nigeria/

Latest Articles
group image
US-funded substation inaugurated
2022-06-09
group image
What is DDP (Diamond Dotted Paper) and What is the Correct Drying Process?
2022-02-01
group image
What is HTC Transformer?
2022-01-31
group image
Monitoring High Failure Rate Transformer Subsystems with Automated Thermal Imaging
2021-07-29
group image
How Transformer Winding Design and Production Will be Effected from Eco Design Directive Losses?
2021-06-03

Shortcut Menu


Home

About

Pricing

References

Blog

FAQ's


Calculations


Sound Level Calculation

Voltage Drop Calculation

Volts Per Turn Calculation

Harmonics Calculation

Inrush Calculation

Short Circuit Forces Calculation


Articles


DEWA introduces new smart design for electricity distribution networks

Siemens Energy to deliver first batch of $64 M mega transformers in Nigeria

Hitachi Energy selected bring more power in India


Legal


Terms of Service

Privacy Policy

Distance Sales Agreement


Contact


Izmir, Turkey

+90 232 421 61 17

info@zenithar.net

Alsancak Mah. Atatürk Cd. No: 398/420 35220 Konak / İzmir Turkey


2020 © Zenithar