• English
    English
  • Sign Up
  • Log in
  • Guest
    avatar
    Login Sign Up
  • Home
  • About
  • References
  • Services
    • Transformer Consultancy
    • Turnkey Transformer Factory Establishment
  • Blog
  • Pricing
  • Calculations
    • Sound Level Calculation
    • Voltage Drop Calculation
    • Volts Per Turn Calculation
    • Harmonics Calculation
    • Inrush Calculation
    • Short Circuit Forces Calculation
    • Transformer Optimization Calculation
  • FAQ's
  • Contact
Author
  •   Zenithar Company
  •   Ali Can CANPOLAT
  •   Rauf T. Holdur
  •   Suheyla Isik

Categories
  • News
  • Statistics
  • Transformes
  • Switchgear
  • Power Network
  • Energy
Worley wins offshore substation contract

Categories: News - 2022-03-31 10:54:33

group image

Worley has been awarded a contract by Keppel Offshore & Marine to provide engineering services for the construction of two offshore substation platforms (OSS) for a wind farm project.

The Australian engineering firm will provide detailed design engineering services and procurement and fabrication support for the two OSS topsides modules.

The project is crucial to meet clean energy targets in the local areas and sets out to provide renewable energy to thousands of homes. It will also support investment for future operations and maintenance regimes.

Earlier this year, Worley completed topsides optimization studies to reduce the size and weight of the OSS modules to minimize expenditure during the fabrication and installation phases.

The project will benefit from a significant digital element. The second OSS will be a replication of the first by using digital replication and 3D model technology. It’s a more sustainable way of designing assets by saving on time and resources.

“Being part of a project that supports the energy transition through the development of new energy practices aligns with our purpose of delivering a more sustainable world,” said Rob Langford, Senior Director Offshore Wind US. “This contract adds to our portfolio of offshore substation projects and by working with Keppel, it defines that global supply chain collaboration is paving the way for the future of the energy industry.”

This text is taken from https://www.powertransformernews.com/2022/03/24/worley-wins-offshore-substation-contract/

Latest Articles
group image
US-funded substation inaugurated
2022-06-09
group image
What is DDP (Diamond Dotted Paper) and What is the Correct Drying Process?
2022-02-01
group image
What is HTC Transformer?
2022-01-31
group image
Monitoring High Failure Rate Transformer Subsystems with Automated Thermal Imaging
2021-07-29
group image
How Transformer Winding Design and Production Will be Effected from Eco Design Directive Losses?
2021-06-03

Shortcut Menu


Home

About

Pricing

References

Blog

FAQ's


Calculations


Sound Level Calculation

Voltage Drop Calculation

Volts Per Turn Calculation

Harmonics Calculation

Inrush Calculation

Short Circuit Forces Calculation


Articles


EthosEnergy installs Hitachi tap changers

First substation installed at NnG windfarm

US-funded substation inaugurated


Legal


Terms of Service

Privacy Policy

Distance Sales Agreement


Contact


Izmir, Turkey

+90 232 421 61 17

info@zenithar.net

Alsancak Mah. Atatürk Cd. No: 398/420 35220 Konak / İzmir Turkey


2020 © Zenithar