• English
    English
  • Sign Up
  • Log in
  • Guest
    avatar
    Login Sign Up
  • Home
  • About
  • References
  • Services
    • Transformer Consultancy
    • Turnkey Transformer Factory Establishment
  • Blog
  • Pricing
  • Calculations
    • Sound Level Calculation
    • Voltage Drop Calculation
    • Volts Per Turn Calculation
    • Harmonics Calculation
    • Inrush Calculation
    • Short Circuit Forces Calculation
    • Transformer Optimization Calculation
  • FAQ's
  • Contact

First substation installed at NnG windfarm

Categories: News - 2022-06-16 10:35:47

group image

Neart na Gaoithe (NnG) offshore wind farm has achieved a major milestone as the first of its two offshore electricity substations was installed at the site of the project.

This milestone means NnG can be fully connected to the National Grid ahead of the project’s 54 wind turbines being installed in 2023.

Saipem used the largest offshore wind installation vessel in the world, the Heerema Sleipnir, to place the 1100 tonne topside onto one of the two foundation jackets.

The innovative ‘rock socket’ seabed supports for the jackets were prepared last year by the Saipem 7000 and Saipem 3000 construction vessels in a water depth of approximately 50 metres, to anchor the offshore substation to the seabed.

Once installed, the power generated by the offshore wind farm’s turbines will be exported via NnG’s two offshore substations to its onshore substation where the energy will access the National Grid’s entry point at Crystal Rig in the Lammermuir Hills, East Lothian.

The first turbines will be operational in mid-2023, with the completion of the entire wind farm scheduled for 2024.

NnG, jointly owned by EDF Renewables and ESB, will have a capacity of c.450MW. It will supply enough low carbon electricity for around 375,000 homes and will offset over 400,000 tonnes of CO2 emissions each year.

Matthias Haag, NnG Project Director, said: “Having the first of NnG’s two offshore substations in place is a really important moment for everyone involved in the construction of this major offshore development for Scotland.

“A lot of hard work has gone in to preparing the seabed and installing two foundation jackets to help us reach this significant milestone and I’m pleased that we can now continue with connecting the platform to the grid and undertaking further foundation works.

“It’s an exciting time for NnG as construction continues both offshore and onshore and we are on track for our first turbines to be operational in mid-2023, with completion of the entire wind farm scheduled for 2024.”

This text is taken from https://www.powertransformernews.com/2022/06/09/first-substation-installed-at-nng-windfarm/

Explanations of Calculations

  • Sound Level Calculation
  • Voltage Drop Calculation
  • Volts Per Turn Calculation
  • Inrush Calculation
  • Harmonics Calculation
  • Short Circuit Forces Calculation

Categories

  • News
  • Announcement

Author

  •   Zenithar Company
  •   Ali Can CANPOLAT
  •   Rauf T. Holdur
  •   Suheyla Isik

News

  • EthosEnergy installs Hitachi tap changers
  • First substation installed at NnG windfarm
  • US-funded substation inaugurated
  • Doble equips utilities to embrace substation automation
  • PKP Energetyka to build hydrogen storage at traction substation
  • Meralco to retrofill 220,000 transformers with natural ester oil
  • New transformer units set to arrive in Shetland
  • Siemens launches new pole-mounted transformer
  • SCADA system as solution to remote substation management
  • Transformer core market to reach $13.5 B by 2030
    • Previous
    • 1
    • 2
    • 3
    • 4
    • 5
    • 6
    • 7
    • 8
    • 9
    • 10
    • 11
    • 12
    • 13
    • 14
    • 15
    • 16
    • 17
    • 18
    • 19
    • 20
    • 21
    • 22
    • Next

Announcement

  • Our New Software: ZeniFlow
  • PTOP Your Power Transformer Optimization Program
  • Short Circuit Forces Calculation Explanation
  • Inrush Calculation Explanation
  • Harmonic Calculation Explanation
  • Volts per Turn Calculation Explanation
  • Voltage Drop Calculation Explanation
  • Sound Level Calculation Explanation
  • We are Ready to launch!

Shortcut Menu


Home

About

Pricing

References

Blog

FAQ's


Calculations


Sound Level Calculation

Voltage Drop Calculation

Volts Per Turn Calculation

Harmonics Calculation

Inrush Calculation

Short Circuit Forces Calculation


Articles


EthosEnergy installs Hitachi tap changers

First substation installed at NnG windfarm

US-funded substation inaugurated


Legal


Terms of Service

Privacy Policy

Distance Sales Agreement


Contact


Izmir, Turkey

+90 232 421 61 17

info@zenithar.net

Alsancak Mah. Atatürk Cd. No: 398/420 35220 Konak / İzmir Turkey


2020 © Zenithar